How to Install a 10″ PVC BE Well Casing SCH 40 for Maximum Durability
1. Begin by measuring the area where the PVC BE WELL CASING SCH 40 will be installed. Make sure to measure the Length, width, and depth of the area.
2. Cut the PVC BE WELL CASING SCH 40 to the desired length. Use a saw or other cutting tool to make sure the cut is precise.
a Labels are for information and assistance in ordering.
b Nominal linear masses, threaded and coupled (Column 4) are shown for information only.
c The densities of martensitic chromium Steels (l80 Types 9Cr and 13Cr) are less than tHose of Carbon steels; The masses shown are therefore not accurate for martensitic chromium steels; A mass correction factor of 0.989 shall be used.
d Mass gain or loss due to end finishing; See 8.5.
e Drift diameter for most common bit size; This drift diameter shall be specified in the purchase agreement and marked on the Pipe; See 8.10 for drift requirements.
f Based on 758 mPa minimum yield strength or greater.
g Based on 379 mPa minimum yield strength.
3. Clean the area where the casing will be installed. Make sure to remove any dirt, debris, or other Materials that could interfere with the installation.
4. Apply PVC primer to the area where the casing will be installed. This will help ensure a secure bond between the casing and the surface.
5. Apply PVC cement to the area where the casing will be installed. Make sure to spread the cement evenly and completely cover the area.
6. Place the PVC BE WELL CASING SCH 40 into the area. Make sure to press it firmly into the cement to ensure a secure bond.
Oil Tubechinesehigh-qualityFactory,Casing Pipechina Best Supplier,7. Allow the cement to dry completely before using the casing. This will ensure maximum durability.
Benefits of Using 10″ PVC BE WELL CASING SCH 40 for Your Well Casing