The process of Spiral Welding in Oil/Gas Drilling SSAW  API 5L Carbon Steel Tube

Spiral welding is a crucial process in the production of oil/gas drilling SSAW API 5L carbon Steel Tubes. This method involves the joining of two steel strips by continuously forming a spiral shape and welding them together. The resulting spiral welded tube possesses excellent strength and durability, making it ideal for use in the Oil and Gas drilling industry. The process of spiral welding begins with the preparation of the steel strips. These strips are typically made from high-quality carbon steel, which offers superior mechanical properties and Corrosion resistance. The strips are then carefully inspected for any defects or imperfections that could affect the integrity of the final product. Once the steel strips pass the inspection, they are fed into a spiral forming machine. This machine gradually bends the strips into a spiral shape, with each revolution overlapping the previous one. The precise control of the forming machine ensures that the spiral shape is consistent and uniform throughout the Length of the tube.
Labels a     Calculated Mass c
  Nominal Linear Mass T& C b,cWall Thick- ness   em, Mass Gain or Loss Due to End Finishing d
 Outside Diameter  Inside DiameterDrift DiameterPlain- endkg
       Round ThreadButtress Thread
      wpe    
 Dkg/mtDmmkg/mShortLongRCSCC
 mm mmmm      
123456789101112
8 5/824219.0835.726.71205.66202.4835.1410.93
8 5/828219.0841.677.72203.64200.4640.2410.07— 12.44— 12.57— 2.51
8 5/832219.0847.628.94201.2200.02 e 198.02 195.5846.339.3912.4412.572.51
8 5/832219.0847.628.94201.2193.68 e46.339.3911.611.681.62
8 5/836219.0853.5710.16198.76193.0452.358.7210.7310.770.71
8 5/840219.0859.5311.43196.22190.558.5310.7310.770.71
8 5/840219.0859.5311.43196.22187.658.539.889.87–0.20
8 5/844219.0865.4812.7193.68 64.648.888.85–1.21
8 5/849219.0872.9214.15190.78 71.51   
9 5/832.3244.4848.077.92228.6224.6646.211— 14.48— 13.87— 2.74
9 5/836244.4853.578.94226.6222.6351.9310.3613.5912.971.84
9 5/840244.4859.5310.03224.4222.25 e 220.45 218.41 218.41 216.54 216.5457.999.6913.5912.971.84
9 5/840244.4859.5310.03224.4215.90 e57.999.6912.7812.151.01
9 5/843.5244.4864.7411.05222.4215.90 e 212.83 212.8363.6112.84 f12.151.01
9 5/843.5244.4864.7411.05222.4212.72 e63.6112.0311.390.25
9 5/847244.4869.9411.99220.5212.72 e 210.29 210.29 209.58 206.38 203.23 200.0268.7512.09 f11.390.25
9 5/847244.4869.9411.99222.5 68.7510.579.92–1.22
9 5/853.5244.4879.6213.84216.8 78.7210.63 f9.92–1.22
9 5/853.5244.4879.6213.84216.8 78.7210.579.92–1.22
9 5/853.5244.4879.6213.84216.8 78.7210.63 f9.92–1.22
9 5/853.5244.4879.6213.84216.8 78.729.588.92–2.22
9 5/858.4244.4886.9115.11214.25 85.479.65 f8.92–2.22
9 5/858.4244.4886.9115.11214.25 85.479.588.92–2.22
9 5/858.4244.4886.9115.11214.25 85.479.65 f8.92–2.22
9 5/858.4244.4886.9115.11214.25 85.47
9 5/859.4244.4888.415.47213.5 87.37
9 5/864.9244.4896.5817.07210.3 95.73
9 5/870.3244.48104.6218.64207.2 103.82
9 5/875.6244.48112.5120.24204 111.93  
As the spiral shape is formed, the edges of the steel strips are brought together. At this point, the welding process begins. A high-frequency electrical current is applied to the edges of the strips, causing them to heat up and melt. The molten edges are then fused together, creating a strong and continuous weld. Mobile Accessories To ensure the quality of the weld, various measures are taken during the welding process. For instance, the welding speed is carefully controlled to maintain a consistent heat input. This helps to prevent overheating or underheating, which could lead to weak or defective welds. Additionally, the welding parameters, such as the current and voltage, are closely monitored and adjusted as needed. After the welding is complete, the spiral welded tube undergoes a series of inspections and tests. These include visual inspections to check for any surface defects, such as cracks or porosity. The tube is also subjected to Non-destructive testing methods, such as ultrasonic or radiographic testing, to detect any internal flaws that may compromise its integrity. Once the tube passes all the required inspections and tests, it is ready for further processing. This may involve additional treatments, such as heat treatment or surface coating, to enhance its performance and protect it from corrosion. The final product is then carefully packaged and prepared for shipment to the oil and gas drilling sites. In conclusion, the process of spiral welding plays a crucial role in the production of oil/gas drilling SSAW API 5L carbon steel tubes. This method ensures the creation of strong and durable tubes that can withstand the harsh conditions