Person 1: “So, what is the production process for K55 casing?”
Casing Pipe,casing well pipe, casing supreme pipe, casing vs carrier pipe, casing for ac pipe, casing Steel Pipe, casing pipe size, casing pvc pipe
Price, casing pipe,
casing pipe Suppliers in
china, casing capping pipe,
casing drill pipe,carrier pipe,casing pipe size,bushing flange,bushing
Sleeve,
bushing,bushing arm,bushing bearing,bushing reducer,bushing tool,bushing pvc,bushing meaningPerson 2: “The production process for K55 casing involves several steps. First, the raw
Materials are inspected for quality and then cut into the desired
Lengths. Next, the ends of the casing are beveled and
Threads are cut into the casing. After that, the casing is heat treated to increase its strength and durability. Finally, the casing is tested for quality assurance and then packaged for shipment.”
Person 1: “What kind of raw materials are used?”
Person 2: “K55 casing is typically made from
Carbon steel,
Stainless Steel, or alloy steel. The raw materials must meet certain specifications in order to be used in the production process.”
| | | | | | Calculated Mass c |
| | Nominal Linear Mass T& C b,c | Wall Thick- ness | | | | em, Mass Gain or Loss Due to End Finishing d |
Labels a | Outside Diameter | | | Inside Diameter | Drift Diameter | Plain- end | kg |
| | | | | | | Round Thread | Buttress Thread |
| | | | | | wpe | | | | |
| D | kg/m | t | D | mm | kg/m | Short | Long | RC | SCC |
| mm | | mm | mm | | | | | | |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
10 3/4 | 32.75 | 273.05 | 48.74 | 7.09 | 258.9 | 254.91 | 46.5 | 13.94 | — | — 15.38 | — 3.03 |
10 3/4 | 40.5 | 273.05 | 60.27 | 8.89 | 255.3 | 251.31 | 57.91 | 11.91 | — | 14.21 | 1.86 |
10 3/4 | 45.5 | 273.05 | 67.71 | 10.16 | 252.7 | 250.82 e 248.77 246.23 246.33 | 65.87 | 11 | — | 14.21 | 1.86 |
10 3/4 | 45.5 | 273.05 | 67.71 | 10.16 | 252.7 | 244.48 e | 65.87 | 11 | — | 13.05 | 0.7 |
10 3/4 | 51 | 273.05 | 75.9 | 11.43 | 250.2 | 244.48 e 243.94 243.94 241.40 241.40 238.86 238.86 234.95 231.80 228.60 | 73.75 | 10.11 | — | 13.05 | 0.7 |
10 3/4 | 51 | 273.05 | 75.9 | 11.43 | 250.2 | | 73.75 | 10.16 f | — | 12.25 | –0.09 |
10 3/4 | 55.5 | 273.05 | 82.59 | 12.57 | 247.9 | | 80.75 | 9.3 | — | 12.01 | –0.34 |
10 3/4 | 55.5 | 273.05 | 82.59 | 12.57 | 247.9 | | 80.75 | 9.35 f | — | 12.25 | –0.09 |
10 3/4 | 55.5 | 273.05 | 82.59 | 12.57 | 247.9 | | 80.75 | 9.3 | — | 12.01 | –0.34 |
10 3/4 | 55.5 | 273.05 | 82.59 | 12.57 | 247.9 | | 80.75 | 9.35 f | — | 11.07 | — |
10 3/4 | 60.7 | 273.05 | 90.33 | 13.84 | 245.4 | | 88.47 | 8.42 | — | 10.87 | — |
10 3/4 | 60.7 | 273.05 | 90.33 | 13.84 | 245.4 | | 88.47 | 8.47 f | — | 9.98 | — |
10 3/4 | 65.7 | 273.05 | 97.77 | 15.11 | 242.8 | | 96.12 | 7.54 | — | 9.74 | — |
10 3/4 | 65.7 | 273.05 | 97.77 | 15.11 | 242.8 | | 96.12 | 7.60 f | — | — | — |
10 3/4 | 73.2 | 273.05 | 108.93 | 17.07 | 238.9 | | 107.76 | — | — | — | — |
10 3/4 | 79.2 | 273.05 | 117.86 | 18.64 | 235.8 | | 116.95 | — | — | — | — |
10 3/4 | 85.3 | 273.05 | 126.94 | 20.24 | 232.6 | | 126.19 | — | — | | |
11 3/4 | 42 | 298.45 | 62.5 | 8.46 | 281.5 | 279.40 e 277.50 275.44 272.39 | 62.56 | 13.27 | — | — | — |
11 3/4 | 42 | 298.45 | 62.5 | 8.46 | 281.5 | 269.88 e | 62.56 | 13.27 | — | — 16.04 | — |
11 3/4 | 47 | 298.45 | 69.94 | 9.52 | 279.41 | 269.88 e | 67.83 | 12.42 | — | 14.5 | — |
11 3/4 | 54 | 298.45 | 80.36 | 11.05 | 276.4 | 269.65 | 78.32 | 11.23 | — | 13.12 | — |
11 3/4 | 60 | 298.45 | 89.29 | 12.42 | 273.6 | 269.65 e | 87.61 | 10.17 | — | 13.12 | — |
11 3/4 | 60 | 298.45 | 89.29 | 12.42 | 273.6 | 269.88 e 267.36 264.92 | 87.61 | 9.77 f | — | 13.12 | — |
11 3/4 | 60 | 298.45 | 89.29 | 12.42 | 273.6 | | 87.61 | 10.17 | — | 13.12 | — |
11 3/4 | 60 | 298.45 | 89.29 | 12.42 | 273.6 | | 87.61 | 9.77 f | — | — | — |
11 3/4 | 65 | 298.45 | 96.73 | 13.56 | 271.3 | | 95.27 | — | — | — | — |
11 3/4 | 65 | 298.45 | 96.73 | 13.56 | 271.3 | | 95.27 | — | — | — | — |
11 3/4 | 71 | 298.45 | 105.66 | 14.78 | 268.9 | | 103.4 | — | — | | — |
Person 1: “What kind of testing is done to ensure quality?”
Person 2: “The casing is tested for hardness, tensile strength, and
Corrosion resistance. It is also tested for dimensional accuracy and surface finish. All of these tests are done to ensure that the casing meets the required specifications.”
Oil pipe,oil pipe joint, oil pipelines Company China,
oil pipe from tank to Boiler,
oil pipe insulation,
oil pipeline Construction cost per km, oil pipe for sale near me,
oil pipeline contractor in China,
oil pipe cutter, oil pipe leak, oil pipe size chart, oil pipeline construction, oil pipeline cleaning, oil pipe fence, oil pipeline, oil pipe,
oil pipeline company, oil pipe welder,oil pipeline,oil pipe insulation,oil pipeline contractor in China,oil pipe size chart,oil pipeline company,oil pipe from tank to boiler,
oil pipe|oil pipe cutter,oil pipe leak,oil pipe for sale near me,
oil pipeline inspection robot,oil pipeline construction,oil pipe welder,oil pipeline cleaning,
Tubing near me,tubing connector,Tubing Pipe