An Overview of the production process of N80 Casing

The production process of N80 casing is a complex and intricate process that requires a great deal of precision and expertise. This process involves several steps, beginning with the selection of the raw Materials and ending with the final product. Oil Pipe,oil pipe joint, oil pipelines Company china, oil pipe from tank to Boiler, oil pipe insulation, oil pipeline Construction cost per km, oil pipe for sale near me, oil pipeline contractor in China, oil pipe cutter, oil pipe leak, oil pipe size chart, oil pipeline construction, oil pipeline cleaning, oil pipe fence, oil pipeline, oil pipe, oil pipeline company, oil pipe welder,oil pipeline,oil pipe insulation,oil pipeline contractor in China,oil pipe size chart,oil pipeline company,oil pipe from tank to boiler,oil pipe|oil pipe cutter,oil pipe leak,oil pipe for sale near me,oil pipeline inspection robot,oil pipeline construction,oil pipe welder,oil pipeline cleaning,Tubing near me,tubing connector,Tubing Pipe The first step in the production process of N80 casing is the selection of the raw materials. This includes selecting the Steel grade, the Wall thickness, and the Length of the casing. The steel grade is typically selected based on the application and the desired properties of the casing. The wall thickness is determined by the Pressure rating of the casing and the length is determined by the wellbore depth.
Once the raw materials have been selected, the next step is to cut the casing to the desired length. This is typically done using a cutting machine, which is designed to cut the casing to the exact length required. The next step is to Thread the casing. This is done using a threading machine, which is designed to create threads on the casing that will allow it to be connected to other components in the wellbore. The next step is to heat treat the casing. This is done to improve the strength and durability of the casing. Heat treating involves heating the casing to a specific temperature and then cooling it r APIdly.
Casing Pipe,casing well pipe, casing supreme pipe, casing vs carrier pipe, casing for ac pipe, casing Steel Pipe, casing pipe size, casing pvc pipe Price, casing pipe, casing pipe Suppliers in China, casing capping pipe, casing drill pipe,carrier pipe,casing pipe size,bushing flange,bushing Sleeve,bushing,bushing arm,bushing bearing,bushing reducer,bushing tool,bushing pvc,bushing meaningThe next step is to inspect the casing. This is done to ensure that the casing meets all of the required specifications. This includes checking for any defects or irregularities in the casing. The final step in the production process of N80 casing is to package the casing. This is done to ensure that the casing is properly protected during shipping and storage. alt-8913 The production process of N80 casing is a complex and intricate process that requires a great deal of precision and expertise. By following these steps, Manufacturers can ensure that the casing meets all of the required specifications and is of the highest quality.
Labels a     Calculated Mass c
  Nominal Linear Mass T& C b,cWall Thick- ness   em, Mass Gain or Loss Due to End Finishing d
 Outside Diameter  Inside DiameterDrift DiameterPlain- endkg
       Round ThreadButtress Thread
      wpe    
 Dkg/mtDmmkg/mShortLongRCSCC
 mm mmmm      
123456789101112
8 5/824219.0835.726.71205.66202.4835.1410.93
8 5/828219.0841.677.72203.64200.4640.2410.07— 12.44— 12.57— 2.51
8 5/832219.0847.628.94201.2200.02 e 198.02 195.5846.339.3912.4412.572.51
8 5/832219.0847.628.94201.2193.68 e46.339.3911.611.681.62
8 5/836219.0853.5710.16198.76193.0452.358.7210.7310.770.71
8 5/840219.0859.5311.43196.22190.558.5310.7310.770.71
8 5/840219.0859.5311.43196.22187.658.539.889.87–0.20
8 5/844219.0865.4812.7193.68 64.648.888.85–1.21
8 5/849219.0872.9214.15190.78 71.51   
9 5/832.3244.4848.077.92228.6224.6646.211— 14.48— 13.87— 2.74
9 5/836244.4853.578.94226.6222.6351.9310.3613.5912.971.84
9 5/840244.4859.5310.03224.4222.25 e 220.45 218.41 218.41 216.54 216.5457.999.6913.5912.971.84
9 5/840244.4859.5310.03224.4215.90 e57.999.6912.7812.151.01
9 5/843.5244.4864.7411.05222.4215.90 e 212.83 212.8363.6112.84 f12.151.01
9 5/843.5244.4864.7411.05222.4212.72 e63.6112.0311.390.25
9 5/847244.4869.9411.99220.5212.72 e 210.29 210.29 209.58 206.38 203.23 200.0268.7512.09 f11.390.25
9 5/847244.4869.9411.99222.5 68.7510.579.92–1.22
9 5/853.5244.4879.6213.84216.8 78.7210.63 f9.92–1.22
9 5/853.5244.4879.6213.84216.8 78.7210.579.92–1.22
9 5/853.5244.4879.6213.84216.8 78.7210.63 f9.92–1.22
9 5/853.5244.4879.6213.84216.8 78.729.588.92–2.22
9 5/858.4244.4886.9115.11214.25 85.479.65 f8.92–2.22
9 5/858.4244.4886.9115.11214.25 85.479.588.92–2.22
9 5/858.4244.4886.9115.11214.25 85.479.65 f8.92–2.22
9 5/858.4244.4886.9115.11214.25 85.47
9 5/859.4244.4888.415.47213.5 87.37
9 5/864.9244.4896.5817.07210.3 95.73
9 5/870.3244.48104.6218.64207.2 103.82
9 5/875.6244.48112.5120.24204 111.93  

Similar Posts