Before production of P110 casing can begin, the raw Materials must be sourced and inspected for quality. This includes Steel, Thread protectors, and other components. Once the materials have been approved, the production process can begin.
Step 2: Cutting
The steel is cut into the desired shape and size for the P110 casing. This is done using a cutting machine that is specifically designed for this purpose.
OilPipe,oil pipe joint,oil pipelines Companychina, oil pipe from tank to Boiler, oil pipe insulation, oil pipeline Construction cost per km,oil pipe for sale near me, oil pipeline contractor in China, oil pipe cutter,oil pipe leak,oil pipe size chart,oil pipeline construction,oil pipeline cleaning,oil pipe fence,oil pipeline, oil pipe, oil pipeline company,oil pipe welder,oil pipeline,oil pipe insulation,oil pipeline contractor in China,oil pipe size chart,oil pipeline company,oil pipe from tank to boiler,oil pipe|oil pipe cutter,oil pipe leak,oil pipe for sale near me,oil pipeline inspection robot,oil pipeline construction,oil pipe welder,oil pipeline cleaning,Tubing near me,tubing connector,Tubing PipeStep 3: Threading
The casing is then threaded using a threading machine. This machine is used to create the threads that will be used to connect the casing to other components.
Step 4: Heat Treatment
The casing is then heat treated to ensure that it is strong and durable. This process involves heating the casing to a specific temperature and then cooling it quickly.
Step 5: Testing
Once the casing has been heat treated, it is tested to ensure that it meets the required standards. This includes testing for strength, durability, and other factors.
Step 6: Finishing
The casing is then finished with a protective coating. This coating helps to protect the casing from corrosion and other environmental factors.
Step 7: Packaging
The casing is then packaged for shipping. This includes wrapping the casing in protective material and labeling it for easy identification.
Step 8: Shipping
The casing is then shipped to its destination. This is done using a reliable shipping method to ensure that the casing arrives safely and on time.
Step 9: Installation
Once the casing has arrived at its destination, it is then installed in the desired location. This is done using the appropriate tools and techniques to ensure that the casing is securely installed.
Total range length, inclusive Permissible variation, max a
6.10 to 7.92 e
8.53 to 10.36
11.58 to 13.72 0.61
0.61
0.61
PUP JOINTS
Lengths: 0.61; 0.91; 1.22; 1.83; 2.44; 3.05 and 3.66 e
Tolerance: ±0.076
a Length variation applies to rail car shipment to the point of use and does not apply to order items of less than 18,144 kg of pipe.
b By agreement between purchaser and Manufacturer, the maximum length may be increased to 8.57 m.
c By agreement between purchaser and manufacturer, the maximum length may be increased to 10.76 m.
d By agreement between purchaser and manufacturer, the maximum length may be increased to 17.72 m.0.61 m pup joints may be furnished up to 0.91 m long by agreement between purchaser and manufacturer, and lengths other than tHose listed may be furnished by agreement between purchaser and manufacturer.